Marupe, Latvia
Daugava Stadium – T-Fest Concert
September 2026
A scaffolding structure was built at Daugava Stadium for the T-Fest concert to support the installation of the LED screen and sound equipment.
The main challenge of the project was the extremely short installation timeframe, as well as the significant loads that the structure had to support from the screen and sound equipment.
To ensure the stability of the structure, ballast with a total weight of approximately 200 tonnes was used. The ballast consisted of both concrete weights and water tanks.
The solution was designed and implemented in accordance with the event's technical requirements, ensuring the necessary load-bearing capacity and structural stability under a demanding installation schedule.