Latvia
Riga Airport, Rail Baltica Project
October 2025 – Present (project ongoing)
As part of the project, scaffolding structures are used to support steel beams during the installation process, as well as to provide safe access to the beam connection points.
The Layher TG-60 support tower system is used, providing high load-bearing capacity and stability. One of the main challenges of the project is the highly precise installation of the support towers, ensuring that the beam support points fully correspond to the elevation levels specified in the project.
The compatibility of the Layher TG-60 system with the Layher Allround modular system significantly accelerates the installation process while maintaining the required precision and structural stability.